Should a quality photo belong to the job or the inspection?
There is a photo of a finished part in a folder, and its file name mentions a work order. Someone asks whether it was taken before or after the part was reworked. The file cannot answer. A work order can go through more than one inspection. If the evidence is attached only to the job in general, the decision it supported may be lost among later attachments.
Imagine an illustrative job that reaches inspection after an operation. The inspector photographs a surface defect and fails the work. The part is reworked and inspected again; a new photo accompanies a pass. This is not a customer case. It is a simple way to expose a record-keeping problem: both pictures belong to the same work order, but they do not belong to the same decision. If they are presented as a single undifferentiated gallery, a reader may mistake the first photo for evidence of the second result.
Completion is not approval
In infab.cloud, a work order reaching the Waiting for Quality stage creates an inspection record in the quality queue. The queue shows the product, operation and quantity. The inspector enters an inspection scope percentage, can add a note, and records a pass or fail. A scope of 100 represents full inspection; a lower percentage can describe sampling. Recording a percentage does not itself supply a measurement report or define acceptance criteria. It documents how much was examined.
The queue concerns the output of production, not materials arriving at the warehouse. Incoming stock has a separate quality gate attached to receipt movements; only receipts that pass that gate count toward available stock. An accepted delivery of raw material does not mean the work made from it has passed its own inspection. Keeping the two decisions apart helps teams ask the right question when stock is ready but the next production operation is still waiting.
Production staff can progress a work order through execution and send it to Waiting for Quality. Only a Manager or Quality Engineer can mark it passed or rejected from the Quality screen. A dependent work order becomes ready only when the prior operation has passed inspection. This is more than a screen permission: it separates an operator’s statement that the operation is complete from the decision that its output may proceed.
Evidence needs an inspection address
The quality queue offers a photo or document upload for each pending inspection. An inspector can attach a defect photo, a measurement report or a PDF. The file picker supports images and PDFs, allows multiple files and offers camera selection on a phone or tablet. The important detail is the association: an uploaded file belongs to the pending inspection record, not merely to the work order at large. When rework leads to a second inspection, its attachments stay separate from those of the first.
The history view lets a reader open the evidence for each completed inspection. The same files can also be seen on the production work order panel with a Quality label. Those are two views of the same records, not two independent decisions. For the example job, a reader can inspect the failed check and its photo, then the later check and its different photo. A picture remains supporting evidence, not a substitute for the inspector’s notes or the shop’s own acceptance criteria.
Phones often produce files with identical names. A filename such as image.jpg cannot safely identify which check it belongs to. The product’s quality-evidence design assigns a unique storage key to each upload while preserving the original displayed name. Its tests check that two uploads with the same name have distinct keys and both remain in inspection history. That does not tell us whether either photo is a good inspection record. It does prevent the filename alone from becoming an unreliable way to distinguish evidence.
Choosing when evidence is compulsory
A Manager can set one of three evidence policies in production settings. Attachments can remain optional, be required for a fail or partial rejection, or be required for every inspection. Under a compulsory policy, an inspector cannot save a result without at least one file. The product tests cover a failed result blocked under the fail-only policy, a passing result allowed without evidence under that policy, and a passing result blocked under the all-inspections policy.
The choice has operational consequences. Requiring a file for every routine pass may be appropriate where a shop already collects inspection documents, but it also adds a step to every check. Requiring evidence for failures and partial rejections can focus attention on decisions likely to need explanation later. Neither setting supplies a quality procedure by itself. The shop still needs to decide what counts as useful evidence, how an inspector names the observed problem in the notes and what to do when a photograph cannot show the relevant measurement.
A failed work order can go to rework, be accepted with a deviation note, be cancelled with a reason, or have only a rejected quantity separated. With partial rejection, the acceptable quantity continues while a separate work order is created for the rejected quantity. A reworked job returns for another inspection, and the earlier check is retained. The history can therefore show a sequence of decisions rather than a single result overwritten each time the part comes back.
That history has a boundary. The product’s roadmap explicitly says that a separate formal nonconformance and corrective-action record, including its own NCR number and root-cause tracking, is not yet available. Photos, notes and decisions are useful records of inspection; they should not be described as a complete CAPA workflow. If a factory needs that process, it should identify where the additional records live and how people connect them to the relevant inspection.
Test the record with a real workflow
Before deciding that a shared work-order attachment folder is enough, choose a representative job and walk through the inspection record. Check when the job enters the queue, where scope and notes are recorded, and how the attachments appear in history. In a controlled test, send the job through rework and a second check. Can someone unfamiliar with the job tell which file supports which result without relying on the file’s name? If not, the problem is not a shortage of photos but a shortage of context.
A useful quality record should let a future reader connect a result, its inspector, its time and its evidence to a particular check. It should also explain why the following operation was allowed to start. The production and inspection screens are introduced at infab.cloud; the specific queue, evidence policies and history view are described in the product documentation.
Verification note: This account was checked against the infab.cloud quality and production documentation and the product’s quality-evidence implementation and tests.